REFERANSLAR


TEKFEN TOROS TARIM
Buhar Santrali
BOILER MANUFACTURING AND ERECTION
1 pc 25 ton/h, 64 bar 420ºC WATER TUBE STEAM BOILER
EREN HOLDİNG
Buhar Santrali
BOILER MANUFACTURING AND ERECTION
1 pc 68 ton/h, 16 bar 325ºC WATER TUBE STEAM BOILER
ORHANELİ POWER PLANT
Buhar Santrali
BOILER MANUFACTURING AND ERECTION
1 pc 50 ton/h, 17 bar 250ºC WATER TUBE STEAM BOILER
AGRANA ŞEKER GRUP
Buhar Santrali
BOILER MANUFACTURING AND ERECTION (TÜV CONTROLLED)
1 pc 30 ton/h, 13 bar 205ºC
COAL FUELED TRAVELLING GRATE WITH SPREDER STEAM BOILER
AMBARLI NATURALGAS POWER PLANT
Buhar Santrali
Boiler Retubing and Erection
3pcs 320 ton/h, 80 bar 550ºC Steam Boiler
AMBARLI FUEL OIL POWER PLANT
Buhar Santrali
Boiler Retubing and Erection
2pcs 320 ton/h, 480 ton/h,
190 bar 540ºC Steam Boiler
PARK TERMİK POWER PLANT
Buhar Santrali
Boiler Retubing and Erection
1pc 500 ton/h, 170 bar 530 ºC
Pulvarized Coal Burned Steam Boiler
ULUSOY TEKSTİL
Buhar Santrali
15 ton/h &8211; Complete Heat Plant
15 ton/h ,10 bar Water Tube Steam Boiler
2pcs 50 ton/h, 36 bar 400ºC Steam Boiler
2pcs 4400 kW Steam Turbine
1pc 350 m³ Capacity Continue Limestone Production facility
MMK - ATAKAŞ GEBZE
Buhar Santrali
Manufacturing, Erection and Comisioning
2 pcs 18 t/h,10 bar, 184°C TÜV SÜD controlled - CE certificated
MMK - ATAKAŞ İSKENDERUN
Buhar Santrali
Manufacturing, Erection and Comisioning
3 pcs 15 t/h,10 bar, 184°C TÜV SÜD controlled - CE certificated
Sayfa: [1][2]