REFERANSLAR
TEKFEN TOROS TARIM Buhar Santrali BOILER MANUFACTURING AND ERECTION 1 pc 25 ton/h, 64 bar 420ºC WATER TUBE STEAM BOILER |
|
|
EREN HOLDİNG Buhar Santrali BOILER MANUFACTURING AND ERECTION 1 pc 68 ton/h, 16 bar 325ºC WATER TUBE STEAM BOILER |
|
|
ORHANELİ POWER PLANT Buhar Santrali BOILER MANUFACTURING AND ERECTION 1 pc 50 ton/h, 17 bar 250ºC WATER TUBE STEAM BOILER
|
|
|
AGRANA ŞEKER GRUP Buhar Santrali BOILER MANUFACTURING AND ERECTION (TÜV CONTROLLED) 1 pc 30 ton/h, 13 bar 205ºC COAL FUELED TRAVELLING GRATE WITH SPREDER STEAM BOILER
|
|
|
AMBARLI NATURALGAS POWER PLANT Buhar Santrali Boiler Retubing and Erection 3pcs 320 ton/h, 80 bar 550ºC Steam Boiler
|
|
|
AMBARLI FUEL OIL POWER PLANT Buhar Santrali Boiler Retubing and Erection 2pcs 320 ton/h, 480 ton/h, 190 bar 540ºC Steam Boiler
|
|
|
PARK TERMİK POWER PLANT Buhar Santrali Boiler Retubing and Erection 1pc 500 ton/h, 170 bar 530 ºC Pulvarized Coal Burned Steam Boiler
|
|
|
ULUSOY TEKSTİL Buhar Santrali 15 ton/h &8211; Complete Heat Plant 15 ton/h ,10 bar Water Tube Steam Boiler 2pcs 50 ton/h, 36 bar 400ºC Steam Boiler 2pcs 4400 kW Steam Turbine 1pc 350 m³ Capacity Continue Limestone Production facility
|
|
|
MMK - ATAKAŞ GEBZE Buhar Santrali Manufacturing, Erection and Comisioning 2 pcs 18 t/h,10 bar, 184°C TÜV SÜD controlled - CE certificated
|
|
|
MMK - ATAKAŞ İSKENDERUN Buhar Santrali Manufacturing, Erection and Comisioning 3 pcs 15 t/h,10 bar, 184°C TÜV SÜD controlled - CE certificated
|
|
|
|
|